Railway · India

What was the 2020 estimated completion cost of phase I of the Kochi Metro?

Kochi Metro is the elevated metro of Kochi in Kerala, India, operated by Kochi Metro Rail Limited (KMRL), whose Phase I runs 25.612 km from Aluva to Petta with 22 stations, begun in June 2013 and opened in stages from the 13 km, 11-station Aluva to Palarivattom reach on 17 June 2017 to the final stretch from Thykoodam to Petta on 7 September 2020, with the cost shared between the Indian government (64.14 percent) and the government of Kerala (35.86 percent). The KMRL website gives the estimated completion cost of Phase I as Rs 5181.79 crore.

Published project estimate

INR 51.8179 billion

Approximately $699.3 million

Cost basis: 2020

Kochi Metro Rail Limited (The Project)
Try today’s cost challenge

Free to play · No account needed

Kochi Metro 2024
Ganesh Mohan TCC BY-SA 4.0

Cost evidence

Basis of the published figure

Published project estimate2020
kochimetro.org

Project metrics

Key dimensions

Total lengthRailway Technology
25.612 km

Project record

Timeline

  1. 2013

    Construction started

    Railway Technology
  2. 17 June 2017

    Opened or launched

    Kochi Metro Rail Limited (Phase I Status)