Road or highway · Vietnam

How much did Long Thanh – Ben Luc Expressway cost to build?

The Ben Luc-Long Thanh Expressway is the four-lane expressway of 57.8 km (2.7 km in Tay Ninh, 26.4 km in Ho Chi Minh City and 28.7 km in Dong Nai) in southern Vietnam, including the Binh Khanh and Phuoc Khanh cable-stayed bridges, built over 12 years from 2014 by the Vietnam Expressway Corporation with loans from JICA and the Asian Development Bank, and fully opened to traffic on 1 October 2026 after about 30 km had opened in 2025. Nhan Dan reported on 30 September 2026 a total investment of VND 29.587 trillion, while the approval of 2010 was VND 31.32 trillion (USD 1.5 billion).

Reported project cost

VND 29587 billion

Approximately $1.22 billion

Cost basis: 2025

Đường Cao Tốc, Tp Hồ Chí mInh Trung Lương, Thạnh phú, bến lức, Long an
trungydangCC BY 3.0

Cost evidence

Basis of the published figure

Reported project cost2025
dtinews.dantri.com.vn

Project metrics

Key dimensions

Total lengthNhan Dan Online
57.8 km

Project record

Opened or launched

Dan Tri (DTiNews)

1 October 2026