How much does the section 2 of Los Angeles — Purple Line — Purple Phase 2 cost?
Purple Line Extension Section 2 (D Line Extension Section 2 / Phase 2) in Los Angeles is the 2.55-mile segment of twin-bored tunnels with two new stations at Wilshire/Rodeo and Century City Constellation, built by Tutor Perini Civil as design-builder under a contract of USD 1.55 billion for the Los Angeles County Metropolitan Transportation Authority, as part of a nine-mile, seven-station westward extension of the D (Purple) Line. The Los Angeles Business Journal reported in November 2025 that Segment 2 was projected to cost about USD 2.9 billion with opening in the second quarter of 2027.
Published project estimate
$2.9 billion
Cost basis: 2025
Cost evidence
Basis of the published figure
Project record
Current completion estimate
Los Angeles Business Journal2027