Railway · United States

How much does the section 2 of Los Angeles — Purple Line — Purple Phase 2 cost?

Purple Line Extension Section 2 (D Line Extension Section 2 / Phase 2) in Los Angeles is the 2.55-mile segment of twin-bored tunnels with two new stations at Wilshire/Rodeo and Century City Constellation, built by Tutor Perini Civil as design-builder under a contract of USD 1.55 billion for the Los Angeles County Metropolitan Transportation Authority, as part of a nine-mile, seven-station westward extension of the D (Purple) Line. The Los Angeles Business Journal reported in November 2025 that Segment 2 was projected to cost about USD 2.9 billion with opening in the second quarter of 2027.

Published project estimate

$2.9 billion

Cost basis: 2025

HR4000 train awaiting departure at Union Station
ROTRANSITCC BY 4.0

Cost evidence

Basis of the published figure

Published project estimate2025
tutorperini.com

Project record

Current completion estimate

Los Angeles Business Journal

2027