Railway · India

How much did the phase 1 of Lucknow Metro cost?

The Lucknow Metro is the rapid transit system of Lucknow, Uttar Pradesh, whose Phase 1A is the North-South Corridor of 22.878 km (19.438 km elevated and 3.44 km underground) with 22 stations from CCS Airport to Munshi Pulia, built for the Lucknow Metro Rail Corporation from 2016 and opened in stages from 5 September 2017 until the full corridor on 9 March 2019. Wikipedia says INR 6,928 crore (INR 69.28 billion) was spent on Phase 1A within an estimated USD 2 billion for Phases 1A and 1B, while the consultant Geodata lists a project cost of USD 1,146 million.

Final project cost

INR 69.28 billion

Approximately $983.81 million

Cost basis: 2019

Image of Lucknow Metro running over an elevated track.
Wikiboy2364CC BY-SA 4.0

Cost evidence

Basis of the published figure

Final project cost2019
geodata.it

Project metrics

Key dimensions

Total lengthGEODATA Engineering SpA
22.878 km

Project record

Timeline

  1. 5 September 2017

    Opened or launched

    geodata.it
  2. 9 March 2019

    Completed

    GEODATA Engineering SpA

Now make the guess