How much did the first 7.5-mile segment of Houston's METRORail cost?
METRORail is the light rail system of Houston, Texas, operated by METRO, whose first line, the 7.5-mile (12.1 km) section of the Red Line between Fannin South and UH-Downtown, opened on 1 January 2004; the system now has three lines, the Red, Purple and Green Lines, 22.7 miles and 39 stations. The initial segment cost USD 324 million, and voters approved a USD 1.23 billion Phase II expansion of the then unopened system.
Try today’s cost challenge
Free to play · No account needed
eschipulCC BY-SA 2.0
Cost evidence
Basis of the published figure
Reported project cost2004
Project metrics
Key dimensions
- Total lengthWikipedia (METRORail Red Line)
- 12.1 km
Project record
Opened or launched
Wikipedia (METRORail Red Line)1 January 2004