How much does Mumbai — Line 2 — Line 2B cost?

Mumbai Metro Line 2B, the eastern extension of the Yellow Line, is a fully elevated corridor of 23.64 km with 20 stations from D. N. Nagar in Andheri via Bandra Kurla Complex, Kurla and Chembur to Mandale in Mankhurd, built by the MMRDA with half of its cost funded by the Centre and the State and the rest by loans from the Asian Development Bank and the World Bank. The Free Press Journal (4 August 2025) and Swarajya (15 October 2025) give its cost as INR 10,986 crore, with the first phase from Diamond Garden to Mandale opened on 8 April 2026 and Chembur station on 13 August 2026 per Wikipedia, and the remaining stations expected between December 2026 and December 2027, against an original October 2022 deadline.

Published project estimate

INR 109.86 billion

Approximately $1.26 billion

Cost basis: 2025

it shows how efficiently metro rakes are run.
MumbaimetroCC BY-SA 4.0

Cost evidence

Basis of the published figure

Published project estimate2025
swarajyamag.com

Project metrics

Key dimensions

Total lengthFree Press Journal
23.64 km

Project record

Timeline

  1. 2022

    Planned completion

    Swarajya
  2. 2027

    Current completion estimate

    freepressjournal.in