Railway · Germany

How much did the extension of Nuremberg — U3 — U3 extension to Grossreuth cost?

The U3 extension to Grossreuth bei Schweinau added a driverless metro section of about 1.1 km and one new 239 m long station to the Nuremberg U-Bahn, built from October 2014 and opened on 15 October 2020 by the Nuremberg transport company VAG. inFranken reported on the opening day that construction cost about EUR 62 million plus EUR 7 million for driverless operation, about EUR 69 million in total, with federal and state funding of about EUR 43 million.

Reported project cost

€69 million

Approximately $78.81 million

Cost basis: 2020

Map of the nuremberg metrolines
HerrMayCC BY-SA 3.0

Cost evidence

Basis of the published figure

Reported project cost2020
urban-transport-magazine.com

Project metrics

Key dimensions

Total lengthUrban Transport Magazine
1,000 m

Project record

Timeline

  1. 2014

    Construction started

    Urban Transport Magazine
  2. 15 October 2020

    Opened or launched

    inFranken.de