How much did the extension of Nuremberg — U3 — U3 extension to Grossreuth cost?
The U3 extension to Grossreuth bei Schweinau added a driverless metro section of about 1.1 km and one new 239 m long station to the Nuremberg U-Bahn, built from October 2014 and opened on 15 October 2020 by the Nuremberg transport company VAG. inFranken reported on the opening day that construction cost about EUR 62 million plus EUR 7 million for driverless operation, about EUR 69 million in total, with federal and state funding of about EUR 43 million.
Reported project cost
€69 million
Approximately $78.81 million
Cost basis: 2020
Cost evidence
Basis of the published figure
Project metrics
Key dimensions
- Total lengthUrban Transport Magazine
- 1,000 m