How much did O-Train cost to build?
The O-Train is Ottawa's rail transit system of several lines: Line 2 (19 km, 11 stations, opened on 15 October 2001 as a diesel pilot project), Line 1 (12.5 km, opened on 14 September 2019), Line 4 (opened on 6 January 2025) and lines under construction, so the entry has no single cost. The original 8 km single-track north-south pilot line cost CAD 21 million to construct and buy three Bombardier Talent diesel trains, and CAD 8 million to operate for two years, while the later cancelled electrification and extension was estimated at just under CAD 780 million.
Free to play · No account needed
Cost evidence
Basis of the published figure
Project record
Opened or launched
Wikipedia (O-Train)15 October 2001