How much did Osaka — Higashi Line cost to build?

The Osaka Higashi Line (JR Osaka-higashi Line) is the 20.3 km line from Shin-Osaka via Hanaten to Kyuhoji in eastern Osaka, a project started in fiscal 1996 that double-tracked and electrified the former Joto freight line, with the 9.2 km Hanaten to Kyuhoji section opening on 15 March 2008 and the 11.1 km Shin-Osaka to Hanaten section on 16 March 2019. The railway-project database Tabiris gives its project cost as JPY 124.3 billion (1,243 oku yen), built by Osaka Outer Loop Railway with state subsidy and operated by JR West.

Reported project cost

¥124.3 billion

Approximately $1.14 billion

Cost basis: 2019

JR西日本221系NC610編成によるおおさか東線普通列車久宝寺行き(南吹田駅)
さりとCC BY-SA 4.0

Cost evidence

Basis of the published figure

Reported project cost2019
westjr.co.jp

Project metrics

Key dimensions

Project record

Timeline

  1. 16 March 2019

    Opened or launched

    鉄道計画データベース (Tabiris)

Now make the guess

Could you estimate it without seeing the answer?

BudgetGuessr turns real project costs into a daily estimation challenge.

Play BudgetGuessr

Keep exploring

View all projects