Railway · Norway

How much did Oslo — Løren Line cost to build?

The Loren Line (Lorenbanen) is the 1.6 km tunnel section of the Oslo Metro between Sinsen and Okern, connecting the Ring Line with the Grorud Line and including the new Loren station, built from June 2013 to April 2016 as part of Oslo Package 3 and opened on 3 April 2016. Lokalhistoriewiki and Norwegian Wikipedia both state that the station and line cost NOK 1.33 billion in total, while the ground-work contract awarded to Skanska in May 2013 was NOK 357 million.

Reported project cost

NOK 1.33 billion

Approximately $158.33 million

Cost basis: 2016

Løren subway station, Oslo, Norway, an underground rapid transit station of the Oslo Metro. Opened in April 2016 it is the newest on the subway network.
UlflarsenCC BY-SA 4.0

Cost evidence

Basis of the published figure

Reported project cost2016
no.wikipedia.org

Project metrics

Key dimensions

Total lengthlokalhistoriewiki.no
1,600 m

Project record

Timeline

  1. 2013

    Construction started

    lokalhistoriewiki.no
  2. 3 April 2016

    Opened or launched

    lokalhistoriewiki.no