Railway · Panama
What is the estimated cost of Panama Metro Line 3?
Panama Metro Line 3 is a 25 km monorail with 14 stations linking Panama City with Panama Oeste across the Panama Canal through a 4.5 km tunnel beneath the canal, built by a Hyundai Engineering & Construction, POSCO and Hyundai Engineering joint venture, with Hitachi Rail and Mitsubishi supplying rolling stock and systems under a USD 883 million subcontract. Railway Gazette reported on 12 May 2026 the USD 2.5 billion construction contract and a planned 2028 opening; costs rose from an initial USD 2.6 billion estimate to more than USD 4 billion after the tunnel redesign and the 2023 protests.
Free to play · No account needed
Cost record
How the cost changed
Budgets, contracts and final costs may cover different stages. Each figure keeps its own year and source.
Published project estimate
2026$4 billion
WikipediaOriginal budget
2020$2.6 billion
railwaygazette.comProject metrics
Key dimensions
- Total lengthRailway Gazette International
- 25 km
Project record
Current completion estimate
Railway Gazette International2028