How much did the 1988–2003 reconstruction of SEPTA's Frankford Elevated cost?

The Frankford Rehabilitation is SEPTA's complete reconstruction of the Frankford Elevated, the eastern elevated section of the Market-Frankford Line in Philadelphia, between the 2nd Street portal and Frankford Transit Center, carried out from 1988 to 2003 with a new stringer-and-deck structure on the original columns and rebuilt stations. It cost USD 493.3 million, plus a separate USD 160 million new Frankford Transit Center terminal opened in 2003.

Reported project cost

$493.3 million

Cost basis: 2003

Wikipedia