Line D of the Prague Metro is the new 10.6 km driverless line from Namesti Miru to Depo Pisnice with ten stations (Namesti Miru, Namesti Bratri Synku, Pankrac, Olbrachtova, Nadrazi Krc, Nemocnice Krc, Nove Dvory, Libus, Pisnice and Depo Pisnice) and 12 trainsets, built by the Prague Public Transit Company (DPP), with construction begun on 21 April 2022 on the Pankrac to Olbrachtova section. e15 wrote in June 2025 that the latest cost estimate was CZK 120 billion, up from CZK 73 billion in 2019 and CZK 98 billion in 2021, with the Pankrac to Pisnice section due in 2032 and the Namesti Miru section in 2036.
Published project estimate
CZK 120 billion
Approximately $5.48 billion
Cost basis: 2025
Cost evidence
Basis of the published figure
Project metrics
Key dimensions
- Total lengthe15.cz
- 10.6 km
Project record
Current completion estimate
e15.cz2032