What was the estimated cost of the Chicago Daily News Building when work began in 1928?

Riverside Plaza is the Chicago Art Deco office building originally constructed for the Chicago Daily News beside the Chicago River. At the start of construction in March 1928, TIME reported an estimated USD 8 million cost for the 25-storey newspaper headquarters, which also incorporated rented upper-floor offices and a plaza over railroad tracks. TIME reported that the newspaper had moved into its new building by June 1929. The USD 8 million was a contemporary estimate, not a verified final construction invoice.

Original budget

$8 million

Cost basis: 1928

Title: Daily News Building, Chicago Subjects: Commercial facilities Places: Illinois > Cook (county) > Chicago Notes: Title from item. Extent: 1 print (postcard) : linen texture, color ; 5 1/2 x 3 1/2 in. Accession #: 06_10_013431
Tichnor Brothers, PublisherPublic domain

The short answer

$8 million

TIME reported an estimated USD 8 million cost when construction of the Chicago Daily News Building began in March 1928. It did not describe the figure as a final invoice. The newspaper had moved into the new building by June 1929.

Cost evidence

Basis of the published figure

Original budget1928
content.time.com

What the number includes

Cost scope

The amount is a contemporaneous estimate for the original newspaper headquarters, including its planned office floors and plaza. It does not claim to be the audited 1929 outturn or the cost of later Riverside Plaza alterations.

Project metrics

Key dimensions

Heightchicagology.com
92.05 m

Project record

Project context

About Riverside Plaza

The Chicago Daily News commissioned a 25-storey steel-and-limestone building by Holabird & Roche beside the Chicago River. The design incorporated offices for rent and a public plaza above active railroad tracks.

Reading the data

How to interpret the figure

The USD 8 million estimate comes from TIME's 12 March 1928 construction-start report; its 17 June 1929 report establishes occupancy, not a final price. Both figures are historical nominal USD without currency conversion or inflation adjustment.