How much did Salt Lake City - North South Corridor cost to build?

The original TRAX North-South line is the Utah Transit Authority's first light rail line, 15.1 miles from the Sandy Civic Center to the Delta Center in downtown Salt Lake City, opened in December 1999 about a year ahead of schedule after two years of construction. KSL reported in August 2011 that UTA says the original line came in at USD 312 million in 1999, a figure also appearing in 1997 Deseret News coverage cited by UtahRails, whereas the earlier snapshot used USD 294.9 million from the FTA Capital Cost Database.

Reported project cost

$312 million

Cost basis: 1999

A Utah Transit Authority Trax light rail vehicle traveling south on the green line in downtown Salt Lake City. The LRV is a Siemens S70.
GarrettCC BY 2.0

Cost evidence

Basis of the published figure

Reported project cost1999
utahrails.net

Project metrics

Key dimensions

Total lengthKSL.com
24.301 km

Project record

4 December 1999