Railway · Chile

What was the 2011 design-stage cost estimate for Santiago Metro Line 3?

Santiago Metro Line 3 has 21 stations over 25 km, with its first section between Los Libertadores and Fernando Castillo Velasco opened on 22 January 2019 and the extension to Plaza Quilicura opened to the public on 25 September 2023. The 2011 design cost about 1,722 million dollars for 22 km and 11 stations, and CNN Chile reported an investment of 378.5 million dollars for the Quilicura extension.

Published project estimate

$1.722 billion

Cost basis: 2011

Wikipedia (es): Línea 3 del Metro de Santiago
Try today’s cost challenge

Free to play · No account needed

Trabajos de construcción de la línea 3 del metro de Santiago para la estación Universidad de Chile en calle Bandera, al este del Banco del Estado.
GaboflowersCC BY-SA 3.0

Cost evidence

Basis of the published figure

Published project estimate2011
Wikipedia

Project metrics

Key dimensions

Total lengthcnnchile.com
25 km

Project record

Timeline

  1. 22 January 2019

    Opened or launched

    cnnchile.com
  2. 25 September 2023

    Completed

    cnnchile.com