What is the estimated cost of building the Shikoku Shinkansen?
The Shikoku Shinkansen is a planned high-speed rail network on Shikoku, Japan, that is only a basic plan: no construction order has been issued and it has never been funded. Estimates differ in scope and year: about JPY 4.02 trillion for Case 1 including a bridge or undersea tunnel across the Akashi, Kitan or Hoyo strait, about JPY 1.571 trillion for two Shikoku lines in a 2014 committee calculation, and JPY 1.65 trillion in 2016 for an Oita-Matsuyama tunnel link.
Published project estimate
Planned¥4020 billion
Approximately $26.86 billion
Cost basis: 2025
WikipediaFree to play · No account needed
Cost evidence