Road or highway · Philippines

How much did the Subic–Clark–Tarlac Expressway in the Philippines cost to build?

The Subic–Clark–Tarlac Expressway (SCTEX) is a 93.77 km four-lane tollway in Luzon, Philippines, built by the Bases Conversion and Development Authority (BCDA) with a Japan Bank for International Cooperation loan of JPY 41.93 billion, begun in 2005 and opened in stages from 28 April 2008. GMA News reported in 2010 that it cost PHP 27 billion, mostly (about 85%) financed by the JBIC loan; Wikipedia breaks the cost into PHP 25.737 billion of direct costs, PHP 7.146 billion of indirect costs (land, consulting, taxes) and PHP 2.074 billion of financing costs, which add up to about PHP 34.96 billion; Philstar called it a PHP 21 billion project in 2007.

Reported project cost

PHP 27 billion

Approximately $598.54 million

Cost basis: 2010

Upload Wizard photos of - - Pan-Philippine Highway[1] or Daang Maharlika - along the scenic and most beautiful Subic–Clark–Tarlac Expressway SCTEX [2] taken from a UV Van Express going to Balanga, Bataan, moving vehicle photography of the amazing scenery of hills and mountains, Sierra Madre Mountain ranges, Central Luzon to Dinalupihan exit at Dinalupihan, Bataan [3] exit going to Layac, Dinalupihan, Bataan.
Ramon FVelasquezCC BY-SA 3.0

Cost evidence

Basis of the published figure

Reported project cost2010
en.wikipedia.org

Project metrics

Key dimensions

Total lengthphilstar.com
93.77 km

Project record

Timeline

  1. 5 April 2005

    Construction started

    philstar.com
  2. 28 April 2008

    Opened or launched

    philstar.com