Railway · India

What was the estimated cost of Kerala's SilverLine, successor of the Thiruvananthapuram–Mangalore high-speed corridor?

The Thiruvananthapuram-Mangalore high-speed passenger corridor was a rail line mooted in Kerala's 2009-10 budget and cleared by the state cabinet in February 2010, with KSIDC as nodal agency, but Indian media reported in 2014 that it was shelved at a dead stage. Its idea lived on in the 530 km Thiruvananthapuram-Kasaragod SilverLine semi-high-speed rail of K-Rail, which the Kerala cabinet officially scrapped on 21 May 2026, stopping land acquisition. SilverLine's cost was Rs 63,941 crore, an early estimate was Rs 56,443 crore, and the corridor was never built; a separate high-speed proposal now costs about Rs 60,000 crore.

Published project estimate

Cancelled

INR 639.41 billion

Approximately $8.63 billion

Cost basis: 2020

Channeliam
Try today’s cost challenge

Free to play · No account needed

Silver Line Way station in December 2024, after overhead trolleybus wires were removed. Previously Silver Line Way was where dual-mode buses changed over from diesel power to overhead electric power to continue into the Silver Line tunnel, but the introduction of extended-range hybrid buses (which could run on battery power in the tunnel) meant the overhead wires were removed.
4300streetcarCC BY 4.0

Cost evidence

Basis of the published figure

Published project estimate2020
en.channeliam.com

Project metrics

Key dimensions

Total lengthChanneliam
530 km

Now make the guess

Could you estimate it without seeing the answer?

BudgetGuessr turns real project costs into a daily estimation challenge.

Play BudgetGuessr

Keep exploring

View all projects