The Tokyo Monorail extension to Tokyo Station is a proposed 3 km elevated extension of the Tokyo Monorail from its Hamamatsucho terminus, beside the JR Keihin-Tohoku and Yamanote lines, to a new elevated terminus above the Tokaido Line platforms at Tokyo Station, which would connect Haneda Airport with central Tokyo. Tokyo Monorail Co. announced the plan in August 2014 at a cost of JPY 109.5 billion and about ten years of construction, but in 2021 JR East unveiled the Haneda Airport Access Line to Tokyo Station, which places the extension in doubt. It has not been built and no construction has started.
Published project estimate
Planned¥109.5 billion
Approximately $1.03 billion
Cost basis: 2014
Railway Gazette InternationalFree to play · No account needed
Cost evidence
Basis of the published figure
Project metrics
Key dimensions
- Total lengthRailway Gazette International
- 3,000 m