Railway · Japan

How much did the first stage of the Yurikamome line in Tokyo cost to build?

The Yurikamome (Tokyo Waterfront New Transit Rinkai Line) is an automated guideway transit line in Tokyo that links Shimbashi with the Odaiba waterfront sub-centre, operated by Yurikamome Inc., a third-sector company set up in 1988 with the Tokyo Metropolitan Government. The first stage of about 12 km between Shimbashi and Ariake opened on 1 November 1995 and was extended to Toyosu in 2006. According to the railway history site Rail Links the total project cost of the first stage was JPY 170.2 billion, of which JPY 115.1 billion was the infrastructure built by Tokyo (5.3 km by the Bureau of Construction and 6.8 km by the Port and Harbor Bureau) and JPY 55.1 billion the company's own non-infrastructure part.

Final project cost

¥170.2 billion

Approximately $1.81 billion

Cost basis: 1995

Yurikamome 7300 series 7451 formation entering Tokyo International Cruise Terminal Station. In the background is Tokyo Rainbow Bridge and the skyscrapers of Minato Ward.
MaedaAkihikoCC0

Cost evidence

Basis of the published figure

Final project cost1995
ja.wikipedia.org

Project metrics

Key dimensions

Total lengthraillinks.jp
11.9 km

Project record

Timeline

  1. 10 April 1990

    Construction started

    Rail Links (railway history)
  2. 1 November 1995

    Opened or launched

    raillinks.jp