How much did the Sheppard subway in Toronto cost to build?
The Sheppard subway, now TTC Line 4 Sheppard, is a five-station subway in North York, Toronto, running along Sheppard Avenue from Sheppard-Yonge to Don Mills, the shortest rapid transit line in Toronto and the first Canadian subway with tunnel-boring-machine tunnels. Groundbreaking was on 23 June 1994 for what Transit Toronto lists as a CAD 933.9 million project; it opened on 22 November 2002 after about eight years, and Wikipedia says it cost just under CAD 1 billion.
Reported project cost
CAD 1 billion
Approximately $636.8 million
Cost basis: 2002
Cost evidence
Basis of the published figure
Project metrics
Key dimensions
- Total lengthTransit Costs Project
- 5,500 m
Project record