Railway · Canada

How much did the Sheppard subway in Toronto cost to build?

The Sheppard subway, now TTC Line 4 Sheppard, is a five-station subway in North York, Toronto, running along Sheppard Avenue from Sheppard-Yonge to Don Mills, the shortest rapid transit line in Toronto and the first Canadian subway with tunnel-boring-machine tunnels. Groundbreaking was on 23 June 1994 for what Transit Toronto lists as a CAD 933.9 million project; it opened on 22 November 2002 after about eight years, and Wikipedia says it cost just under CAD 1 billion.

Reported project cost

CAD 1 billion

Approximately $636.8 million

Cost basis: 2002

Don Mills Station Platform, November 2021
HutimaCC BY-SA 4.0

Cost evidence

Basis of the published figure

Reported project cost2002
transitcosts.com

Project metrics

Key dimensions

Total lengthTransit Costs Project
5,500 m

Project record

Timeline

  1. 23 June 1994

    Construction started

    Transit Toronto
  2. 22 November 2002

    Opened or launched

    Transit Toronto