What was the estimated total cost of the McClellan–Kerr Arkansas River Navigation System, which ends at the Tulsa Port of Catoosa?
The Tulsa Port of Catoosa, near Tulsa, Oklahoma, is the head of navigation of the 445-mile McClellan-Kerr Arkansas River Navigation System, its largest and most inland port, on about 2,000 acres with an industrial park. It opened in early 1971 when the last section of the waterway was finished, and no source found gives a separate construction cost for the port itself. The only documented cost is the Oklahoma Historical Society's estimate of USD 1.2 billion for the whole navigation system built by the Army Corps of Engineers, and the earlier USD 27.9 million belonged to a wastewater plant at the sister Port of Inola, so this record is low-confidence.
Reported project cost
$1.2 billion
Cost basis: 1970
Oklahoma Historical Society (Encyclopedia of Oklahoma History and Culture)Free to play · No account needed
Cost evidence
Basis of the published figure
Project record
Opened or launched
okhistory.org1971