How much did Stage 1 of Edmonton's Valley Line (Southeast) cost to build?
The Valley Line is Edmonton's low-floor light-rail line, built in two stages. Stage 1, the Southeast line, is a 13.1 km line with 11 stops from Mill Woods to Downtown including a bridge over the North Saskatchewan River; built by TransEd Partners as a public-private partnership from 2016, it opened on 4 November 2023 at a cost of CAD 1.8 billion split equally between the three levels of government. Stage 2, Valley Line West, will add 14 km to Lewis Farms at an estimated CAD 2.7 billion.
Final project cost
CAD 1.8 billion
Approximately $1.33 billion
Cost basis: 2023
Cost evidence
Basis of the published figure
Project metrics
Key dimensions
- Total lengthTransEd Partners
- 13.1 km
Project record