Railway · United States

How much did the South Central Extension of Valley Metro light rail in Phoenix cost?

The South Central Extension is a 5.5-mile light-rail extension of Valley Metro's B Line in Phoenix, Arizona, running from downtown along Central Avenue to Baseline Road with eight new stations, a park-and-ride at Baseline Road and a new downtown transit hub. It opened on 7 June 2025 and turned Valley Metro Rail into a 35-mile, two-line system. Valley Metro reported a project cost of USD 1.34 billion, with federal grants covering more than half and the rest coming from Phoenix Transportation 2050 and regional Proposition 400 funds.

Reported project cost

$1.34 billion

Cost basis: 2025

Zoomable full resolution image available at davidrumsey.com. This image 6809.071 is a part of image group 6809.000. Color map with inset on 2 sheets. Shows towns, inhabitants, railways, roads, canals, Indian reservations, etc. Relief shown by hachures and spot heights. Depth shown by bathymetric tints and in Fathoms. Prime meridian is Greenwich. Second and New edition of The Times Atlas published in 1900 (see our 1895 first edition, 1010.000), containing 132 pages of maps and comprising 196 maps
Andree, Richard Times (London, EnglandPublic domain

Cost evidence

Basis of the published figure

Reported project cost2025
ktar.com

Project metrics

Key dimensions

Project record

7 June 2025