How much did the Boten–Vientiane railway in Laos cost?

The Boten–Vientiane railway is the Lao section of the China–Laos Railway, a 414 km standard-gauge line from Boten on the Chinese border to Vientiane with 75 tunnels, 167 bridges and 32 stations, built by Chinese companies to Chinese standards for passenger trains up to 160 km/h. Construction started on 25 December 2016 and the railway opened on 3 December 2021; it cost an estimated USD 5.965 billion (RMB 37.425 billion), about 60% financed by loans from China Exim Bank and 40% by equity, with Laos holding 30% of the operating company.

Published project estimate

$5.965 billion

Cost basis: 2021

China-Laos train, going over the Mekong river north of Luang Prabang, Laos
Julia Denton-BarkerCC BY-SA 2.0

Cost evidence

Basis of the published figure

Published project estimate2021
thepeoplesmap.net

Project metrics

Key dimensions

Project record

Timeline

  1. 25 December 2016

    Construction started

    Belt and Road Portal
  2. 3 December 2021

    Opened or launched

    Belt and Road Portal