How much does Warsaw — Line 2 cost?
Warsaw Metro Line M2 is the city's second metro line, built since 2010 in sections: the central 6.7 km section with seven stations opened on 8 March 2015, extensions followed to Trocka (2019) and Bemowo (2020–2022), and the Bródno stations opened on 28 September 2022. About 19 km and 18 stations were in operation in 2026, with three final stations (Lazurowa, Chrzanów and Karolin) due to finish on 9 November 2026 to make 21. Forsal puts the total cost of all sections with the ordered trains at about PLN 10 billion.
Published project estimate
PLN 10 billion
Approximately $2.66 billion
Cost basis: 2025
Cost evidence
Basis of the published figure
Project metrics
Key dimensions
- Total lengthforsal.pl
- 19 km
Project record