What was the contract value of the Bródno extension of Warsaw Metro Line M2?
The Bródno extension is the eastern end of Warsaw Metro Line M2 in Targówek, adding three stations (Zacisze, Kondratowicza and Bródno) over a little more than four kilometres of tunnel from Dworzec Wileński. The tunnelling and stations were built by the Astaldi–Gülermak consortium under a contract signed in 2018 worth almost PLN 1.4 billion; construction was finished on 24 August 2022 and the three stations opened on 28 September 2022.
Contract value
PLN 1.4 billion
Approximately $314.06 million
Cost basis: 2022
Cost evidence
Basis of the published figure
Project metrics
Key dimensions
- Total lengthwGospodarce.pl
- 4,000 m