How much did Washington Metro Silver Line cost to build?
The Silver Line is the Washington Metro line built as the Dulles Corridor Metrorail Project, a 23.1-mile extension with 11 new stations constructed in two phases from East Falls Church through Tysons and Reston to Dulles International Airport and Ashburn, which the Metropolitan Washington Airports Authority says opened in November 2022. The authority gives the project a total cost of 6.01 billion dollars, while Fairfax County's March 2020 update shows 2.982 billion for Phase 1 at close-out and a Phase 2 budget of 2.778 billion.
Final project cost
$6.01 billion
Cost basis: 2022
Cost evidence
Basis of the published figure
Project metrics
Key dimensions
- Total lengthMetropolitan Washington Airports Authority
- 37.176 km
Project record
Opened or launched
Metropolitan Washington Airports Authority2022