How much did Xi'an Metro Line 9 cost to build?
Xi'an Metro Line 9 (the Lintong Line) is a 25.296 km underground line with 15 stations from Fangzhicheng to Qinlingxi, using 6-car type-B trains with a top speed of 80 km/h. It is Xi'an's first metro built as a public-private partnership under an invest-build-operate concession held by China Railway Urban Investment, and the first metro line China Railway operates itself. Construction began on 9 January 2017, total investment was ¥13.889 billion, and the line opened for initial operation on 28 December 2020.
Reported project cost
CNY 13.889 billion
Approximately $2.01 billion
Cost basis: 2020
Cost evidence
Basis of the published figure
Project metrics
Key dimensions
- Total lengthChina Railway Group (via The Paper)
- 25.296 km