How much did 75th Anniversary Selatin Tunnel cost to build?
The 75th Anniversary Selatin Tunnel is a twin-bore, six-lane motorway tunnel on T?rkiye's O-31 between ?zmir and Ayd?n. Construction began on 1 April 1990, and the tunnel opened to traffic on 20 April 2000. Its two tubes measure 3,043 and 3,018 metres, each carrying three lanes. The project was an early large-scale application of the New Austrian Tunnelling Method in T?rkiye.
Reported project cost
$121 million
Cost basis: 2000
Osman ÜnlüCC BY 3.0
Cost evidence
Basis of the published figure
Reported project cost2000
Project metrics
Key dimensions
- Total lengthGeneral Directorate of Highways
- 3,043 m
Project record