How much did Ada Bridge cost to build?

Ada Bridge is a 965-metre cable-stayed road-and-rail bridge over the Sava in Belgrade, linking New Belgrade with Čukarica across the tip of Ada Ciganlija. Ponting's single-pylon design carries six road lanes, two light-rail tracks and pedestrian and cycle paths on a 45.2-metre-wide deck. Construction ran from 2008 to 2011, and the bridge officially opened on 1 January 2012. Cost reporting distinguishes the bridge structure itself from the larger programme of interchanges and approach roads.

Final project cost

€161.2 million

Approximately $214.15 million

Cost basis: 2014

Ada Bridge at dusk (January 2012)
Comparativist1CC BY-SA 3.0

Cost record

How the cost changed

Budgets, contracts and final costs may cover different stages. Each figure keeps its own year and source.

Final project cost

2014

€161.2 million

Approximately $214.15 million

ebrd.com

Contract value

2008

€146.9977 million

Approximately $216.2 million

srbija.gov.rs

Financing amount

2010

€129.6 million

Approximately $171.81 million

ebrd.com

Project metrics

Key dimensions

Total lengthPonting
965 m
Main spanPonting
376 m
HeightPonting
200 m
Floor areaPonting
53,325 m²
MassDSD Steel Group
9,000,000 kg

Project record

Timeline

  1. 2008

    Construction started

    PORR
  2. 2011

    Completed

    City of Belgrade
  3. 1 January 2012

    Opened or launched

    Ponting