Tunnel · United States

What is the approved budget of SR 99 tunnel?

The SR 99 tunnel is a two-mile, double-deck highway tunnel carrying State Route 99 beneath downtown Seattle between the stadium district and South Lake Union. It replaced the central-waterfront section of the earthquake-vulnerable Alaskan Way Viaduct. WSDOT selected the bored-tunnel alternative in 2009, Bertha began tunnelling on 30 July 2013, completed the bore on 4 April 2017, and the tunnel opened to traffic on 4 February 2019. WSDOT reports a $2.15 billion budget for the tunnel project, including the design-build tunnel, its north and south access roads, north-portal streets and the later South Access surface connections. That scope is distinct from the $3.35 billion Alaskan Way Viaduct Replacement Program of more than 30 projects.

Approved budget

$2.15 billion

Cost basis: 2024

The north portal of the State Route 99 Tunnel in Seattle, seen from the southbound lanes on opening day, February 2, 2019.
SounderBruceCC BY-SA 4.0

Cost record

How the cost changed

Budgets, contracts and final costs may cover different stages. Each figure keeps its own year and source.

Project metrics

Key dimensions

Project record

Timeline

  1. 30 July 2013

    Construction started

    Washington State Department of Transportation
  2. 4 February 2019

    Opened or launched

    Washington State Department of Transportation