How much did Arena Amazônia cost to build?
Arena da Amazônia – Vivaldo Lima is a 44,351-seat stadium in Manaus, built on the site of the former Vivaldão for the 2014 FIFA World Cup. Designed by Ralf Amann of gmp, its basket-like external structure references Amazonian craft. The stadium opened on 9 March 2014 and later hosted football at the 2016 Olympic Games; it remains an active state-run venue for football and public events. Its sustainability features include rainwater reuse, sewage treatment and natural ventilation.
Final project cost
BRL 623.858 million
Approximately $265.14 million
Cost basis: 2014
Cost evidence
Basis of the published figure
Project metrics
Key dimensions
- CapacityPrefeitura de Manaus
- 44,351 seats
Project record