How much did Arkansas Nuclear One cost to build?

Arkansas Nuclear One is a two-reactor nuclear generating station beside Lake Dardanelle near Russellville, Arkansas. Entergy Arkansas owns both pressurized-water units: Unit 1 entered commercial service in December 1974 and Unit 2 in March 1980. They use different reactor designs and cooling arrangements; Unit 1 draws cooling water from the lake, while Unit 2 uses a cooling tower. Entergy lists their current maximum dependable capacities as 836 and 988 megawatts, respectively.

Reported project cost

$2.522 billion

Cost basis: 2007

Russellville nuclear power plant, February 2010
EdibobbCC BY 3.0

Cost evidence

Basis of the published figure

Reported project cost2007
U.S. Energy Information Administration

Project metrics

Key dimensions

PowerEntergy
1,824 MW

Project record

Timeline

  1. 19 December 1974

    Opened or launched

    Entergy
  2. 26 March 1980

    Completed

    Entergy