How much did Bali Mandara Toll Road cost to build?
Bali Mandara Toll Road is an overwater toll route across Benoa Bay in southern Bali. Its 12.7-kilometre corridor links Nusa Dua, Ngurah Rai airport and Benoa, with separate access for motorcycles. Construction began in 2012 and Indonesia's president officially opened the road on 23 September 2013. An Indonesian government account reports approximately Rp 2.4 trillion spent on construction; this local-currency amount is more informative than the unsourced US$220 million approximation previously used as the answer.
Reported project cost
IDR 2400 billion
Approximately $229.42 million
Cost basis: 2013
Cost evidence
Basis of the published figure
Project metrics
Key dimensions
- Total lengthIndonesian State Secretariat
- 12.7 km