How much did Bataan Nuclear Power Plant cost to build?

Bataan Nuclear Power Plant is a single-unit Westinghouse pressurized-water reactor complex at Napot Point in Morong, west of Manila. Construction began in 1976 and the structure was completed in the mid-1980s, but it was never loaded with fuel or connected to the grid; the Philippine government kept it mothballed over safety and policy concerns. Philippine Nuclear Research Institute material puts its historical construction cost at about US$2.3 billion and its intended electric capacity at roughly 620 MW. A 1976 one-reactor agreement of about US$1.1 billion was an earlier contract figure, not the final build cost; the much earlier US$500 million proposal covered two reactors and is not directly comparable.

Reported project cost

$2.3 billion

Cost basis: 1984

Bataan Nuclear powerplant building
Jiru27Public domain

Cost evidence

Basis of the published figure

Reported project cost1984
www-pub.iaea.org

Project metrics

Key dimensions

Project record

Timeline

Now make the guess

Could you estimate it without seeing the answer?

BudgetGuessr turns real project costs into a daily estimation challenge.

Play BudgetGuessr

Keep exploring

View all projects