Bridge 路 Singapore

How much did Benjamin Sheares Bridge cost to build?

Benjamin Sheares Bridge crosses the Kallang Basin and Marina Bay between the eastern approach to central Singapore and the city centre. Built by the Public Works Department from 1977, the eight-lane elevated crossing opened on 26 September 1981 as part of the East Coast Parkway. It is about 1.8 kilometres long and reaches 29 metres at its highest point, allowing vessels to pass beneath its specially designed trestles. Singapore's National Heritage Board reports a construction cost of S$110 million. After the Marina Coastal Expressway opened in 2013, the crossing's road function shifted from expressway to arterial road.

Reported project cost

SGD 110 million

Approximately $52.07 million

Cost basis: 1981

Benjamin Sheares Bridge, Singapore, From Singapore Flyer
Andy MitchellCC BY-SA 2.0

Cost evidence

Basis of the published figure

Reported project cost1981
remembersingapore.org

Project metrics

Key dimensions

Project record

Timeline

  1. 1977

    Construction started

    Government of Singapore / SG101
  2. 26 September 1981

    Opened or launched

    Government of Singapore / SG101