Tunnel · Czech Republic

How much did Blanka tunnel complex cost to build?

The Blanka tunnel complex is the Prague city-circuit road tunnel of 6.4 km, opened to the public on 19 September 2015. ESTAV.cz wrote on that day that Blanka is the largest and so far by far the most expensive project in modern Prague history at 43 billion Czech crowns, after 16 billion in June 2001 and a 21.2 billion crown bid by Metrostav in 2006.

Final project cost

CZK 43 billion

Approximately $1.75 billion

Cost basis: 2015

Blanka tunnel map.
OpenStreetMap contributorsCC BY-SA 2.0

Cost evidence

Basis of the published figure

Final project cost2015
cs.wikipedia.org

Project metrics

Key dimensions

Total lengthESTAV.cz
6,400 m

Project record

Opened or launched

ESTAV.cz

19 September 2015