How much did Blanka tunnel complex cost to build?
The Blanka tunnel complex is the Prague city-circuit road tunnel of 6.4 km, opened to the public on 19 September 2015. ESTAV.cz wrote on that day that Blanka is the largest and so far by far the most expensive project in modern Prague history at 43 billion Czech crowns, after 16 billion in June 2001 and a 21.2 billion crown bid by Metrostav in 2006.
Final project cost
CZK 43 billion
Approximately $1.75 billion
Cost basis: 2015
OpenStreetMap contributorsCC BY-SA 2.0
Cost evidence
Basis of the published figure
Final project cost2015
Project metrics
Key dimensions
- Total lengthESTAV.cz
- 6,400 m
Project record
Opened or launched
ESTAV.cz19 September 2015