How much was invested in the Boundary Dam Unit 3 carbon-capture retrofit?

At SaskPower's Boundary Dam Power Station near Estevan, Saskatchewan, the existing coal-fired Unit 3 was rebuilt and fitted with a commercial-scale carbon-capture system. Construction began in 2011 and the integrated system officially opened on 2 October 2014. SaskPower describes an approximately C$1.5 billion investment in this retrofit, including a C$240 million federal contribution. Unit 3 produces about 115 MW and the capture system was designed to capture up to one million tonnes of CO2 annually. The original power station opened in 1959; the 2014 retrofit figure is not the cost of building that station or a dam.

Reported project cost

CAD 1.5 billion

Approximately $1.36 billion

Cost basis: 2014

Carbon Capture unit for Boundary Dam power station. On the right is the compressor building.
Implicit MatrixCC BY 4.0

Cost evidence

Basis of the published figure

Reported project cost2014
electricity.ca

Project metrics

Key dimensions

Project record

Timeline

  1. 2011

    Construction started

    AtkinsRealis project contractor
  2. 2 October 2014

    Opened or launched

    Government of Saskatchewan