How much did Brent Spence Bridge cost to build?

The original Brent Spence Bridge is the two-level steel cantilever truss carrying Interstates 71 and 75 across the Ohio River between Covington, Kentucky, and Cincinnati, Ohio. Construction was underway in 1961 and the bridge opened on 25 November 1963 with three traffic lanes on each deck. A contemporary postcard described its original construction as a $10 million project; that historical rounded figure does not cover subsequent repairs, the new companion bridge or the wider Brent Spence Bridge Corridor program. A transportation-agency study distinguishes the roughly 2,951-foot full bridge from its 1,736.5-foot main truss spans and approximately 831-foot longest span. The original bridge remains in service while a separate companion crossing is developed.

Reported project cost

$10 million

Cost basis: 1963

Brent Spence Bridge over the Ohio River in Cincinnati, Ohio and Covington, Kentucky in 2018
Antony-22CC BY-SA 4.0

Cost evidence

Basis of the published figure

Reported project cost1963
cardcow.com

Project metrics

Key dimensions

Project record

Timeline