Tunnel · Türkiye

How much does Buca Onat Tunnel cost?

The Buca Onat Tunnel is the twin-tube road tunnel of about 2.5 km, part of an 8.3 km Buca–Bornova route, under construction in İzmir, Türkiye, financed entirely from the İzmir Metropolitan Municipality's own budget, with excavation begun on 12 March 2018, stopped in June 2019 when the first contractor left, resumed after a tender won by Özkar İnşaat for 559 million liras in April 2022, and an opening targeted for 2026. KARAR reported in May 2025 that the investment cost of the project at current prices is 3 billion liras.

Published project estimate

TRY 3 billion

Approximately $76.04 million

Cost basis: 2025

Looking at the Buca portal (west) of the Buca-Bornova tunnel.
Btian P. DorsamCC BY-SA 4.0

Cost evidence

Basis of the published figure

Published project estimate2025
tr.wikipedia.org

Project metrics

Key dimensions

Total lengthkarar.com
2,543 m

Project record

Timeline

  1. 12 March 2018

    Construction started

    karar.com
  2. 2026

    Current completion estimate

    KARAR