How much did Calvert Cliffs Nuclear Power Plant cost to build?
Calvert Cliffs Nuclear Power Plant is the two-unit pressurised water reactor plant on the Chesapeake Bay at Lusby, Maryland, United States, owned and operated by Constellation Energy, with construction begun on 1 June 1968, Unit 1 in commercial operation on 8 May 1975 and Unit 2 on 1 April 1977, and about 1,718 MW of nameplate capacity. English Wikipedia, citing Vera Foster Rollo's Your Maryland: A History, says the total cost of the two units was approximately 766 million dollars.
Reported project cost
$766 million
Cost basis: 1977
Cost evidence
Basis of the published figure
Project metrics
Key dimensions
- PowerWikipedia (Calvert Cliffs Nuclear Power Plant) infobox
- 1,718 MW
Project record