How much did Centennial Olympic Stadium cost to build?
Centennial Olympic Stadium was the stadium built in Atlanta for the 1996 Summer Olympic Games and designed to be converted afterwards into the baseball stadium that became Turner Field for the Atlanta Braves from 1997. The New Georgia Encyclopedia gives the original cost of the stadium as 207 million dollars, financed by the Atlanta Committee for the Olympic Games, ACOG.
Reported project cost
$207 million
Cost basis: 1996
JaredCC BY 2.0
Cost evidence
Basis of the published figure
Reported project cost1996