Airport · Singapore

How much did Changi Airport Terminal 4 cost to build?

Changi Airport Terminal 4 is the two-storey, 225,000 m² terminal at Singapore Changi Airport that adds capacity for 16 million passengers a year, built from November 2013 by a consortium led by SAA Architects for Changi Airport Group, opened for operation on 31 October 2017 with an official opening on 3 August 2018, and suspended from May 2020 to September 2022. Airport Technology gives the total cost of the T4 project as 1.28 billion Singapore dollars, 600 million for the terminal and 680 million for the airfield infrastructure.

Reported project cost

SGD 1.28 billion

Approximately $926.91 million

Cost basis: 2017

Singapore Airport, Jewel Changi, 20230722 (1)
Takeshi Aida from Hong Kong, Hong KongCC BY-SA 2.0

Cost evidence

Basis of the published figure

Reported project cost2017
en.wikipedia.org

Project metrics

Key dimensions

CapacityAirport Technology
16,000,000 seats

Project record

Timeline

  1. 2013

    Construction started

    Airport Technology
  2. 31 October 2017

    Opened or launched

    airport-technology.com