How much did Channel Tunnel cost to build?

The Channel Tunnel is the 50.46 km rail tunnel under the English Channel between Folkestone in England and Coquelles in France, a privately financed build-own-operate-transfer project started on 1 December 1987 and opened on 6 May 1994. The Global Infrastructure Hub's case study says the cost, originally estimated at 4.8 billion pounds in 1985, reached 9.5 billion pounds by the end of construction, an 80 percent overrun in real terms.

Final project cost

£9.5 billion

Approximately $14.54 billion

Cost basis: 1994

TGV TMST n°3011/2 à la sortie du Tunnel sous la Manche à Coquelles, côté Français.
Billy69150 (voir les conditions d'utilisation / see licensing below)CC BY-SA 4.0

Cost evidence

Basis of the published figure

Final project cost1994
en.wikipedia.org

Project metrics

Key dimensions

Total lengthgihub.org
50.46 km

Project record

Timeline

  1. 1 December 1987

    Construction started

    gihub.org
  2. 6 May 1994

    Opened or launched

    gihub.org