Bridge 路 United States

What is the contract value of Cold Spring Canyon Arch Bridge?

The Cold Spring Canyon Arch Bridge is the steel deck arch bridge of 1,217 ft with a 700 ft main span, about 400 ft above Cold Spring Canyon, carrying California State Route 154 over San Marcos Pass in Santa Barbara County, built by the American Bridge Division of United States Steel from late 1962 and opened to traffic on 7 February 1964. Southland Holdings, which now owns American Bridge, lists the project value as 2,022,829 dollars.

Contract value

$2.0228 million

Cost basis: 1963

A photo of one side of the Cold Spring Canyon Arch Bridge, taken from the highway below.
DreamyshadeCC BY-SA 3.0

Cost evidence

Basis of the published figure

Contract value1963
goletahistory.com

Project metrics

Key dimensions

Total lengthGoleta History
371 m
Main spanSouthland Holdings
213 m

Project record

Timeline

  1. 1962

    Construction started

    Goleta History
  2. 7 February 1964

    Opened or launched

    Goleta History

Now make the guess

Could you estimate it without seeing the answer?

BudgetGuessr turns real project costs into a daily estimation challenge.

Play BudgetGuessr

Keep exploring

View all projects