Bridge 路 United Kingdom

How much did Dornoch Firth Bridge cost to build?

The Dornoch Firth Bridge is the 892 m prestressed concrete box girder bridge carrying the A9 trunk road across the Dornoch Firth between Tain and Dornoch in the Highlands of Scotland, designed and built by the Christiani-Morrison joint venture for the Scottish Office from 1989 and opened in August 1991 by the Queen Mother, replacing a detour of about 26 miles via Bonar Bridge. The Gazetteer for Scotland says it was built at a cost of 13.5 million pounds.

Final project cost

拢13.5 million

Approximately $23.81 million

Cost basis: 1991

Dornoch Firth Bridge
Eirian EvansCC BY-SA 2.0

Cost evidence

Basis of the published figure

Final project cost1991
rossandcromartyheritage.org

Project metrics

Key dimensions

Project record

Opened or launched

scottish-places.info

27 August 1991