How much did Edwin I. Hatch Nuclear Power Plant cost to build?

The Edwin I. Hatch Nuclear Power Plant is the two-unit boiling water reactor station of Georgia Power and partners near Baxley, Georgia, whose Unit 1 began construction in 1968 and entered commercial operation on 31 December 1975 and Unit 2 followed on 5 September 1979. The US Energy Information Administration's Georgia nuclear profile lists the construction cost as 3.214 billion dollars in 2007 dollars.

Reported project cost

$3.214 billion

Cost basis: 2007

E. I. Hatch Nuclear Power Plant near Baxley, Georgia.
CivilengtigerCC BY-SA 3.0

Cost evidence

Basis of the published figure

Reported project cost2007
decommissioningcollaborative.org

Project record

Timeline