How much did Eurasia Tunnel cost to build?

The Eurasia Tunnel is the twin-deck four-lane road tunnel beneath the Bosphorus in Istanbul, built as a build-operate-transfer concession by ATAS and opened in December 2016. The Global Infrastructure Hub case study explains that eleven international financial institutions provided 960 million dollars of loans with an 18-year maturity and the shareholders 285 million, which together make 1.245 billion dollars, while Hurriyet Daily News wrote that the tunnel cost 1.25 billion dollars.

Final project cost

$1.245 billion

Cost basis: 2016

Eurasia Tunnel
SadrettinCC BY-SA 4.0

Cost evidence

Basis of the published figure

Final project cost2016
hurriyetdailynews.com

Project record

Opened or launched

Daily Sabah

20 December 2016